Line 1: Line 1:
-FIXME **This page is not fully translated, yet. Please help completing the translation.**\\ //(remove this paragraph once the translation is finished)// 
- 
 ======= SimpleMilestonesHandler ======= ======= SimpleMilestonesHandler =======
 ==== Description ==== ==== Description ====
Line 7: Line 5:
  
 The action handler proceeds with each milestone as described here (starting with the first): \\ The action handler proceeds with each milestone as described here (starting with the first): \\
-1. The action handler goes through all paths, continuously adding the duration each activity, until the milestone is reached. \\ +<wrap indent>1. The action handler goes through all paths, continuously adding the duration each activity, until the milestone is reached.</​wrap> ​\\ 
-2.    The paths are sorted in descending order according to their total duration. \\ +<wrap indent>2.    The paths are sorted in descending order according to their total duration.</​wrap> ​\\ 
-2.1.  If an assignment is completed at this moment, the duration of the now-completed activity is added to the actual required lead time. \\ +<wrap indent><​wrap indent>2.1.  If an assignment is completed at this moment, the duration of the now-completed activity is added to the actual required lead time.</​wrap></​wrap> ​\\ 
-2.2   Begin with the longest remaining path.  \\ +<wrap indent><​wrap indent>2.2   Begin with the longest remaining path.</​wrap></​wrap> ​ \\ 
-2.3   ​Thereby,​ the total duration will be recalculated (if necessary with already-shortened durations), and a determination is made about whether the milestone date can be upheld. ​ \\ +<wrap indent><​wrap indent>2.3   ​Thereby,​ the total duration will be recalculated (if necessary with already-shortened durations), and a determination is made about whether the milestone date can be upheld.</​wrap></​wrap> ​ \\ 
-2.3.1 If the date is maintained, the process advances to the next milestone, which is then assessed starting with step 1. \\ +<wrap indent><​wrap indent><​wrap indent>2.3.1 If the date is maintained, the process advances to the next milestone, which is then assessed starting with step 1.</​wrap></​wrap></​wrap> ​\\ 
-2.3.2 If the submission date cannot be upheld with the current durations, a calculation will be made to determine what percent of the duration of all activities in the path must be subtracted in order to reach the milestone. The percentage is then subtracted from the durations of all unfinished activities in the path. Lastly, the critical path is recalculated. ​ \\+<wrap indent><​wrap indent><​wrap indent>2.3.2 If the submission date cannot be upheld with the current durations, a calculation will be made to determine what percent of the duration of all activities in the path must be subtracted in order to reach the milestone. The percentage is then subtracted from the durations of all unfinished activities in the path. Lastly, the critical path is recalculated.</​wrap></​wrap></​wrap> ​ \\
  
 >> **Caution!** ​ [[en:​software:​tim:​timer:​calculatetimesforall|calculateTimesForAll]] must be set up! If the calculation should be after every activity, it is advisable to use the  [[en:​software:​tim:​actionhandler:​addactionhandlertonodes|AddActionHandlerToNodes]]. The function "​calculate critical path" must be activated in iGrafx. >> **Caution!** ​ [[en:​software:​tim:​timer:​calculatetimesforall|calculateTimesForAll]] must be set up! If the calculation should be after every activity, it is advisable to use the  [[en:​software:​tim:​actionhandler:​addactionhandlertonodes|AddActionHandlerToNodes]]. The function "​calculate critical path" must be activated in iGrafx.