User Tools

Site Tools


New Features


yes [TNR-1644] - Milestone calculation and backward planning
Enables planning of milstones in processes and also backward time-calculation so that a milestone date can be reached even if a task couldn't be finished in time.

yes [TNR-2420] - Show notes of the main process in related softlinks
Softlinks are now able to show notes of their main processes.

yes [TNR-2606] - Finished activities are highlighted in iGrafx models
If a node is left in a process designed with iGrafx there will be a grey border around the node, so that it is clear which path the process followed.

yes [TNR-2743] - Improve Wordtemplatehandler so that not all variables are resolved when searching the docx-template
If the new parameter is enabled, all process variables starting with “#” are resolved before searching for the template. This feature is designed to find different template languages.

yes [TNR-2837] - Processmanager should be able to delete all documents
It can be configured that all processmanagers are able to delete all attachments even if they didn't upload the files.

yes [TNR-2866] - Send error mails to dynamic recipients
The new handler can read a string or a processvariable containing email adresses to which the errormails will be send.

yes [TNR-2904] - Align ToDo and PM translations for “start process”
Some labels and buttons were renamed in order to avoid confusion in clients.

yes [TNR-2908] - Integrate TIM document converter lib in tim for document conversion handling
A new PDF Converter was implemented which allows to convert all office formats to pdf.

yes [TNR-2723] - Too many linebreaks in error mails
The layout of the error mails was optimized.

yes [TNR-2829] - openOffice connector port and host cannot be set
If the Documentconverter runs on another host or uses another port, this could be set in the tim.properties

yes [TNR-2835] - Reply-to does not work with multiple recipients
It is possible to set more reply-to Recipients in mail nodes, so that the answer could be sent to more than one person.

yes [TNR-2481] - Replace specialchars (def. by blacklist) with _ for sharepoint uploads
If documents are uploaded to sharepoint, all defined specialchars are replaced with an underscore

yes [TNR-2501] - Interpretation of vertical process models
Vertical proccesses can now be deployed and used in all clients.


Bugfixes


yes [TNR-2758] - Task name and task description are not displayed in the task properties
yes [TNR-2754] - Process repository shows too many process elements
yes [TNR-604] - Timer can be archived only with PM rights
yes [TNR-1752] - Notes are not displayed correctly in Reports
yes [TNR-2017] - Enable Multilanguage of WordTemplateHandler
yes [TNR-2153] - Share Documents between Sub and Main process
yes [TNR-2181] - Repository does not show Processes with umlauts
yes [TNR-2199] - Export out of translation client is wrong
yes [TNR-2423] - Archiving a process with running instances results in unknown error message
yes [TNR-2490] - Process monitoring client: Mail nodes are visible
yes [TNR-2565] - Smartform style corrupt for instance start links
yes [TNR-2591] - bootstrap.css modifies non bootstrap Smartforms
yes [TNR-2674] - Team-manager is not able to assign tasks out of the task-list
yes [TNR-2696] - Sorting in ToDo client if remaining time is 00:00
yes [TNR-2710] - Rules Matrix: row sorting is changed by system
yes [TNR-2724] - Set more than one group in Repository
yes [TNR-2728] - Highlighting of BPMN processes is corrupted
yes [TNR-2741] - Copy Instance does not work in second try
yes [TNR-2762] - SSO logged in user loops after server restart
yes [TNR-2765] - Process cannot start when DMS is set to sharepoint
yes [TNR-2772] - MergePDFDocumentHandler doesn't create a valid pdf
yes [TNR-2775] - Transitions cannot be translated
yes [TNR-2786] - ProcessInstanceStart via PD-Name does not work
yes [TNR-2788] - Effort CreationUser is Lazy
yes [TNR-2789] - showDocumentsToFlag shows processarchive files on instancestart
yes [TNR-2794] - Hungarian is translated wrong
yes [TNR-2798] - Task of my group shows up in my tasks after multi assignment
yes [TNR-2808] - Processstart takes 1min to start
yes [TNR-2812] - German translation in language popup: Englisch (US)
yes [TNR-2814] - Wrong smartform is taken if instance is copied
yes [TNR-2819] - Docx4j crashes when converting to docx PDF
yes [TNR-2823] - Tasks missing in repository client in translation
yes [TNR-2827] - Repository Throws Nullpointer on restore
yes [TNR-2831] - Efforts can be tracked twice
yes [TNR-2836] - Startevent ignored in Sectionhandling
yes [TNR-2838] - Tabs are not intepreted in docx wordtemplate when OpenOffice is not running
yes [TNR-2850] - Highlighting in process model is not located correctly
yes [TNR-2854] - Taskmails are not sent. User needs to disable and enable Email-Notification to get it work
yes [TNR-2899] - Task cannot be translated in Repository
yes [TNR-2902] - DBconnectionmanager missing in jndi helper
yes [TNR-2906] - Default Language can be created twice
yes [TNR-2912] - Layout of rulesmatrix popup
yes [TNR-2913] - Values of Variables in PI-Reports is not readable
yes [TNR-2914] - Costcenter is not displayed in ToDo Client
yes [TNR-2916] - mergePdfDocumentsHandler should also merge doc, xls, xlsm files
yes [TNR-2918] - umlaute in uploaded filenames broken when downloaded (IE11)
yes [TNR-2919] - add flag to control pdf converter type
yes [TNR-2920] - Table row limit (e.g. 10 rows) doesn`t enable paging to see that more tasks exist
yes [TNR-2923] - ToDo client: Context menu of process definition allows me to find all open tasks
yes [TNR-2929] - AdHoc Tasks Popup Notes are not using same count information as simple task instance
yes [TNR-2931] - language fallback if wrong locale is set does not work
yes [TNR-2933] - zh-guoyu is not supported by java8 - use zh-cn for simplified chinese

en/software/tim/changelog/tim53.txt · Last modified: 2019/09/18 21:02 by wikiadmin